Cubed out with 0.4 CBM left. 7,768 kg of payload unused — on this lane the box fills up long before it gets heavy.
Packing list
Add
Container 2Yantian CYbooked
58.8
of 68 CBM
24,680
of 26,000 kg
330
cartons
5,320
units
86% cube
95% weight — binds
cut-off Sep 3 · sails Sep 6 · port Sep 30 · on shelf Oct 14
Shantou Fine Plastics 5 lines · $8,420 freight
Weighted out, not cubed out. 9.2 CBM still free but only 1,320 kg — the slant boards alone are 12,936. Nothing ready is light enough to use that space.
Packing list
Add
DeferredNingbo · next slotnot booked
14.0
of 68 CBM
2,802
of 26,000 kg
160
cartons
2,936
units
21% cube — binds
11% weight
cut-off Sep 10 · sails Sep 13 · port Oct 5 · on shelf Oct 19
Ningbo Kai 1 line · Yiwu Sunrise 1 line · not booked
One of these two misses its season at this sailing.
Packing list
Add
One swap fixes Halloween
Drag PB211 sensory scoops out of Container 1 into Deferred. It has +14d of slack and lands exactly on time either way. That frees 11.4 CBM and 4,872 kg — enough for PB604 Halloween twice over.
PB604 landsOct 19→Oct 5
Halloween days left12→26
PB211 slack+14d→0d
Container 167.6 CBM→63.0 CBM
Then top off the last 5.0 CBM with 1,424 of the 2,136 plasma balls — a line can be split across two sailings.
Apply the swap
Why
Packing list — Container 1
Whole container6 lines · 500 ctPDFXLSX
One per supplier
Ningbo Kai Industrial4 lines · 350 ctPDFXLSX
Yiwu Sunrise Trading2 lines · 150 ctPDFXLSX
✓carton dimensions and gross weight
✓HS codes
unit prices
one page per pallet
Only the lines actually loaded appear. Ready dates and cut-off are stamped on the header so the supplier can check them.
Seasons against arrivalsa season deadline is an on-shelf date, so it competes with a stockout date on the same axisHalloween needs Sep 15 — the earliest sailing lands Oct 5
ready inside 30 days
port: any
supplier: any
+ filter
Save as view
Make a rule
sorted by slack ↑ — not by cover, and not by velocity
Goods
Ready to load
Needed on the shelf
The plan
UID
Product
Supplier
Status
Ready
Cartons
CBM
Weight
Units
Cover
On shelf by
Because
Ships in
Lands
Slack
⋮⋮
PB038
Coil spring walking toy
Ningbo Kai
Ready
Aug 20
100
12.4
2,480
4,000
6d
Aug 24
stockout
Container 1
Oct 5
−42d
⋮⋮
PB345
Light-up rubber duck, 3-pack
Ningbo Kai
Ready
Aug 22
100
8.6
2,040
2,400
11d
Aug 29
stockout
Container 1
Oct 5
−37d
⋮⋮
PB402
Fidget chain, 12-pack
Shantou Fine
Production
Sep 1
60
8.2
1,728
1,440
22d
Sep 9
stockout
Container 2
Oct 14
−35d
⋮⋮
PB604
Halloween glow skeleton
Ningbo Kai
Ready
Aug 20
40
6.8
880
800
new
Sep 15
Halloween
Deferred
Oct 19
−34d
This is the row the screen exists for. No sales history, so any cover-based ranking puts it last — and it is finished, sitting at Ningbo Kai today, needing to be on a shelf by Sep 15. Nothing sails fast enough to make Sep 15, so it is late whatever happens and the only real question is how late. Deferred it lands Oct 19 with 12 days of Halloween left. In Container 1 it lands Oct 5 with 26 — twice the season, same goods, same freight.
⋮⋮
PB077
Wobble cushion
Yiwu Sunrise
Ready
Aug 21
60
9.2
2,280
1,200
18d
Sep 5
stockout
Container 1
Oct 5
−30d
⋮⋮
PB106
Slant board, adjustable
Shantou Fine
Ready
Aug 30
70
16.4
12,936
840
41d
Sep 28
stockout
Container 2
Oct 14
−16d
⋮⋮
PB224
Therapy putty, 4-pack
Ningbo Kai
Ready
Aug 25
80
11.2
3,680
3,200
34d
Sep 21
stockout
Container 1
Oct 5
−14d
⋮⋮
PB211
Sensory bin scoops, 6-pack
Ningbo Kai
Ready
Aug 26
70
11.4
4,872
1,680
62d
Oct 19
stockout
Container 1
Oct 5
+14d
⋮⋮
PB512
Christmas light-up snowman
Yiwu Sunrise
Ready
Aug 24
90
14.8
2,880
1,800
210d
Oct 20
Christmas
Container 1
Oct 5
+15d
And this is the one a velocity ranking gets backwards. 210 days of cover, almost no sales this month, so “most urgent first” built on days-of-stock would load it last — onto the Sep 13 sailing, landing Oct 19, one day before it has to be live. Slack ranks it ninth instead of thirteenth and it makes Container 1 with 15 days spare.
⋮⋮
PB811
Sensory swing
Shantou Fine
Production
Sep 3
60
11.2
3,720
600
88d
Nov 14
stockout
Container 2
Oct 14
+31d
⋮⋮
SW043
Baby scale weighing tray
Shantou Fine
Ready
Aug 28
90
13.6
4,896
1,440
128d
Dec 24
stockout
Container 2
Oct 14
+71d
⋮⋮
PB708
Valentine's heart putty
Shantou Fine
Production
Sep 2
50
9.4
1,400
1,000
new
Jan 20
Valentine's
Container 2
Oct 14
+98d
⋮⋮
PB156
Plasma ball, 7 inch
Yiwu Sunrise
Ready
Aug 23
120
7.2
1,922
2,136
195d
Mar 1
stockout
Deferred
Oct 19
+133d
Below the line: ready dates that do not line up, and one that does not exist. PB906 comes off the line Sep 8, which clears the Sep 13 cut-off but misses both booked sailings — so it is offered for the next slot rather than silently dropped. PB318 has no ready date at all because the supplier is still waiting on filling, and nothing can be planned around a blank. Both stay on the screen: an item you cannot schedule is exactly the one that gets forgotten.
⋮⋮
PB906
Bath letters, foam set
Ningbo Kai
Production
Sep 8
80
10.4
1,664
1,920
29d
Sep 16
stockout
Sep 13 sailing
Oct 19
−33d
⋮⋮
PB318
Weighted lap pad
Shantou Fine
No date
—
—
—
—
—
44d
Oct 1
stockout
not schedulable
—
—
15 lines · 140.4 CBM · 2 containers carry 126.4 · 7 land after their date · 1 misses a season · 1 cannot be scheduledslack = needed on shelf − projected landing. Negative is late.